Copyright © Inderes 2011 - present. All rights reserved.
  • Uusimmat
  • Pörssi
    • Aamukatsaus
    • Osakevertailu
    • Pörssikalenteri
    • Osinkokalenteri
    • Analyysi
    • Artikkelit
    • Sisäpiirin kaupat
    • Transkriptit
  • inderesTV
  • Mallisalkku
  • Foorumi
  • Premium
  • Femme
  • Nora AI
  • Opi
    • Sijoituskoulu
    • Q&A
    • Analyysikoulu
  • Meistä
    • Seurantayhtiöt
    • Tiimi
Pörssitiedote

Norsk Hydro: Hydro to close extrusion plant in Lucé, France

Norsk Hydro
Hydro has decided to further consolidate the Extrusions operations in Europe
with a proposal to close the Lucé plant in France. This move is made to optimize
the extrusion footprint in Europe and strengthen competitiveness.

The proposed closure affects approximately 80 employees, and a formal
consultation process with employee representatives at the location will soon
begin. If confirmed, the site will be closed during 2026.

"The European market remains challenging and we need to take further action.
These decisions are difficult, but we will prioritize safety and ensure that
people are treated fairly and respectfully. We will continue to have a strong
presence in the French market, and we are determined to serve our customers with
dedication and a high service level," says Erik Fossum, Senior Vice President of
Hydro Extrusion Europe.

The intention to close the Lucé plant in France follows the intention to close
five other extrusions plants in Europe as announced on November 26, 2025
(https://www.hydro.com/en/global/media/news/2025/hydro-to-close-five-european-
extrusion-plants/). The closure of the two plants in the United Kingdom is
confirmed, and the plants are scheduled to close during Q2 2026. These changes
are aimed at optimizing Hydro's European extrusion footprint, with the aim of
strengthening long-term competitiveness.

The Lucé plant, which has been part of Hydro since 1986, has two extrusion
presses. It is co-located with Hydro's aluminium recycling plant in Lucé, which
is not affected by this decision.

Hydro remains fully committed to the European extrusion markets, and the
proposed changes will not affect the commitments and service levels to
customers. If the decision to close is confirmed, customers that are currently
being served by the affected locations will receive their products from other
Hydro locations.

The total restructuring cost is estimated to NOK 260 million, with NOK 80
million of impairment charges and NOK 175 million of provisions expected to be
taken in Q1 2026. Costs of around NOK 5 million will impact the Adjusted EBITDA
in Q1 2026.


Investor contact:
Elitsa Blessi
+47 91775472
Elitsa.Blessi@hydro.com

Media contact:
Anders Vindegg
+47 93864271
Anders.Vindegg@hydro.com
Sosiaalinen media
  • Inderes Foorumi
  • Youtube
  • Facebook
  • Instagram
  • X (Twitter)
  • Tiktok
  • Linkedin
Yhteystiedot
  • info@inderes.fi
  • +358 10 219 4690
  • Porkkalankatu 5
    00180 Helsinki
Inderes
  • Meistä
  • Tiimi
  • Avoimet työpaikat
  • Inderes sijoituskohteena
  • Palvelut pörssiyhtiöille
Sivusto
  • UKK
  • Käyttöehdot
  • Tietosuojaseloste
  • Vastuuvapauslauseke
Inderesin vastuuvapauslauseke löytyy täältä. Kunkin Inderesin aktiivisessa seurannassa olevan osakkeen tarkemmat tiedot löytyvät kunkin osakkeen omilta yhtiösivuilta Inderes-sivustolla. © Inderes Oyj. Kaikki oikeudet pidätetään.