Privacy preferences
Inderes uses cookies to provide a better user experience and a personalised service. By consenting to the use of cookies, we can develop an even better service and will be able to provide content that is interesting to you.
  • Forum
  • Premium
  • Stock Markets
    • MarketsLive prices, indices, and market performance
    • Morning ReviewDaily market recap and key overnight highlights
    • Stock CalendarUpcoming earnings, listings, and corporate events
    • Dividends CalendarFuture and past dividends
  • Companies
    • CompaniesBrowse and filter the full list of listed companies
    • DiscoveryInspiration for your next investment
    • IPOsNew listings and upcoming public offerings
    • AGM InvitationsAnnual general meeting dates and shareholder info
  • Stock Research
    • ResearchExpert stock analysis and recommendations
    • ArticlesNews, insights, and market commentary
    • PortfolioInderes model portfolio
    • FemmeBreaking barriers and building confidence in investing
  • Learn about investing
    • Analysis SchoolLearn how to read and understand stock analysis
    • Investing SchoolGuides and lessons to grow your investing knowledge
    • Portfolio buildersInvesting knowledge for every level, from first steps to advanced portfolio strategies.
    • inderesTVVideo hub for stock research, analysis, and expert commentary
    • TranscriptsFull text records of earnings calls and investor meetings
    • Stock ComparisonCompare financials and performance across multiple stocks
    • Earnings SeasonCompare EPS estimates to reported results
    • Insider TransactionsTrack buying and selling activity by company insiders
    • Short SellingSee which listed companies have disclosed short interest
    • Virtual Analyst ChatAsk questions and get instant AI-powered investment insights
    • Compound Interest CalculatorSee how your savings grow with the power of compound interest.
Find us on social media
  • Inderes Forum
  • Youtube
  • Facebook
  • Instagram
  • X (Twitter)
  • Tiktok
  • Linkedin
Get in touch
  • info@inderes.fi
  • +358 10 219 4690
  • Porkkalankatu 5
    00180 Helsinki
Inderes
  • About us
  • Our team
  • Careers
  • Inderes as an investment
  • Services for listed companies
Our platform
  • FAQ
  • Q&A
  • Terms of service
  • Privacy policy
  • Disclaimer

Inderes’ Disclaimer can be found here. Detailed information about each share actively monitored by Inderes is available on the company-specific pages on Inderes’ website. © Inderes Oyj. All rights reserved.

Transcripts

Read transcripts of webcasts and audiocasts

Transcripts

Read transcripts of webcasts and audiocasts

All regions
Finland
Sweden
Denmark
Norway
Latest
Trending
Followed

Hexicon, Webcast, Q3'24

By Inderes11/29/2024, 9:00 AM
Hexicon

Disclaimer: This is a machine-generated transcript and may contain inaccuracies.

Marcus Thor
00:01 - 29:02

Good morning, everybody, and thank you for tuning in and listening. I'm here today to provide an update on our business as we release our Q3 report this morning. My name is Marcus Thor, and I'm the CEO of Hexicon. You're very welcome. What I'll do today is go through a couple of items. Um, I will start by giving an update on the Floating Offshore Wind industry, both from a global perspective and also touching base on Sweden, where a lot has happened over the last period. I'll present a brief on Hexicon before going into the highlights of the last period, which for us has been focused on our project in South Korea. MunmuBaram and then I'll end by looking ahead. So let's get to it. To start off with Floating Offshore Wind, an industry that has enormous potential. The way we look at it, the basis for the enormous potential of floating offshore wind is that most offshore wind areas, from a global perspective, are in deep waters now. By the end of 2023, there were 270 MW of floating offshore wind installed globally. And just to put that in perspective, compared to bottom-fixed offshore wind, which is around 75 GW or 75,000 MW, it's a huge difference. And this acceleration in deploying floating wind has been delayed over the last couple of years. And the sentiment in the industry. So what we're seeing today, now in forecasts, is that this acceleration of the installations of offshore wind will really take off towards the end of this decade. That will be led, as we see it, by Europe and Asia. Now, looking at Sweden in particular, a lot has happened here. So I will start to note what happened on November 4th here, when the Swedish government rejected 13 offshore wind projects in the Baltic Sea. So basically, all applications and all projects that were in the Baltic Sea south of Öland were affected. For us, that meant that two of our projects in Sweden, developed under the brand Freja Offshore together with Mainstream Renewable Power, were also affected. Those were the two projects, Cirrus and Dyning. Now, this is quite a drastic measure. It was a measure that none of us, ourselves nor our industry colleagues, were given a heads up about. And I think there's a lot to reflect on in this. And one thing that I will conclude is that Sweden is in no way unique in needing to ensure and prioritize that our defensibility is not jeopardized. Where we are unique, however, is in taking such drastic measures like this against the entire offshore wind industry for a complete region. There are many examples and numerous other markets around the globe, both near us and further away, that are developing offshore wind in synergy with defense strategies. However, on a more positive note, I have to say that Sweden and the government approved the first ever Floating Offshore Wind project, which is our neighbor on the west coast, Poseidon, developed by Vattenfall. And that's a very good signal, because it's the first time we've seen a Floating Offshore Wind project being awarded. The entire West Coast consists of large areas with high electricity needs and very deep waters, as made public by the energy minister herself. Is that on November 19th? There were a number of developers, including ourselves, that were invited to discuss offshore wind with the Swedish Energy Minister. I was part of that meeting, together with many industry colleagues, and can conclude that it was a constructive meeting. My view of the Swedish offshore wind market is that, although it's a longer-term market than some other markets, I remain optimistic. We have challenges, but the fundamental power need in certain regions is such that it can only be satisfied by offshore wind. During the time that it's needed, nonetheless. Again, looking at certain regions, including the west coast of Sweden. Furthermore, regarding the Swedish market, we are looking forward to the government's inquiry. In Swedish, it was called an owner of Wincraft. This was decided upon on May 23rd, and it aims to analyze the regulatory framework for the use of the sea for offshore wind, how that can be improved, and how the permitting process can be made more efficient. This was originally supposed to have been concluded and released already, but it's been pushed back further now. The latest I've heard is in January next year. So this is something to really look forward to as well. And a final note on Sweden is given everything that's happened and if there's anything good to say about it, and it's my own personal view, is that the decision to reject 13 wind farms in the Baltic Sea makes me at least hope that it puts additional pressure on the government to expedite the remaining wind farms that are in the process to be approved. Our Mareld project off the west coast of Sweden is one of the most advanced in its category that has yet to receive approval. So we look forward to it being expedited and finally reaching approval for that project. A brief look at Hexicon. So we are a global offshore wind developer focused on deep water areas. We hold a project portfolio with a total pipeline of around 22GW as of the end of Q3. The net holding for Hexicon. So the part of the gross portfolio that is of Hexicon ownership was around 6.5GW. Hexicon's been around for approximately as long as the industry. So, our experience is truly top-notch in this field. And what we're focusing on are markets that allow expertise and competence to lead, rather than upfront payment for large sea areas, allowing us to secure positions, obtain rights, and continue with project development. Our main activities in terms of projects are in South Korea, South Africa, Italy, and Sweden. We're doing this across the globe in partnerships, not the least because any market to develop the permitting, stakeholder engagements, etc., is a very local discipline. is a very local discipline. What are some of the highlights for the quarter? This has been a period for Hexicon with a lot of focus on MunmuBaram, which is our project over in South Korea. Just stepping back slightly in February of this year, we entered a sales and purchase agreement with Shell to take over the entire project. That required a lot of work during the spring, getting us ready by July 1st to take over the complete responsibility and operations of the project. And this is a large project. This is an over a gigawatt project. So in comparison, it's the size of a nuclear reactor, but we're not taking over responsibility for it. In August, that same project received approval for the Environmental Impact Assessment (EIA). So, this reflects several years of work assessing how the project impacts the environment and other aspects. Getting that approved is a prerequisite for participating in the upcoming auctions. After the quarter, we reached another major milestone, which was signing a Transmission Service Agreement (TSA). So basically, this is the grid connection agreement with Korea Electric Power Corporation (KEPCO). So that's the comparison to Sweden's Svenska Kraftnät. So on November 22nd, which was announced just yesterday, we got the regulatory approval to take over two out of the three licenses that the project possesses. Now come back to this specific point because this is a really important one. So I'll come back to that in just a few slides. One of the other significant events that I already mentioned was obviously in Sweden. And the announcement that made us put two of our projects in Sweden on hold. So we've talked about this before, and I'm sure a lot of you are aware that the renewables industry in general, especially offshore wind and particularly floating offshore wind. We are in a state of the industry that is not the best. One example is the declining cost that was expected for the industry over the last few years, which hasn't happened. It's been rather an increase. So things have been delayed, things have been postponed. Certain companies are exiting the field, exiting projects, delaying projects. That reality is facing us as well. We need to take measures to face this new reality. This does not mean that my long-term view remains extremely optimistic. It's about ensuring staying power to see through this period. The greatest uncertainty, which I cannot specify with certainty, is how long it will take before the industry picks up again. So we are in need of improving our financial structure. This is something we've highlighted already last quarter. This has taken longer due to the lengthy process of getting the regulatory approval for the share transfer of our Korean project. MunmuBaram, that project is such a valuable part of our portfolio. So with this now in place and that uncertainty removed, there are many parallel tracks ongoing that we can now expedite towards closing. Just given this decision in the last few days, knowing where we stand with MunmuBaram makes me optimistic about securing the necessary financing needed to move forward. I can't say for sure when and how, but I'll get back to you as soon as I can. What we're also doing as part of this is to focus on our core projects, which are our most valuable projects and have significant milestones in the near term that can also create revenues for Hexicon. So we are, to some extent, cutting certain resources, and we're also ensuring to a large degree that we're focusing on the few right projects. We're not currently pursuing new markets, and we won't be doing so next year either. We've stopped activities of a few projects and markets. Two examples are the US, where we see a strong presence, and a few very early-stage developments in South Korea, called Pohang. As mentioned before, we've got Cirrus and Dyning here as well due to the government's decision here in Sweden. And what we're also doing is that we are looking into a site-sharing partner for our TwinHub project in the UK. So that, as you call it, is our technology verification project, large enough to host two of our foundation technologies, so we're looking at how we can site share that with another technology to share the economic burden of that project. Now over to MunmuBaram. And I don't intend to go through all these details, but I do want to mention and put some emphasis on MunmuBaram and the fact that this is a very late-stage project, a big project. And what I do want to mention is that with this approval of the change of control. So what that means is that our agreement with Shell to take over. All the shares of the project are now approved, but the project as such contains three licenses. They're called Electricity Business Licenses, which are basically licenses to operate a wind farm in this area. There are three licenses, and each of them is linked to a specific neighboring area. So far, the project has secured two of these, as announced just yesterday. That's for a total of 750MW. While it's not large enough for us to aggressively advance, it remains valuable. It's big enough, it's valuable, and we're moving forward with it so far. The third Electricity Business License (EBL) is still pending a decision. And to give a bit more perspective on that. The reason for this is that the entire regulatory process involves a stringent requirement to demonstrate financial backing for the project. You need to really show significant amounts in order to back the future costs of building projects like this. So far, we've been able to satisfy the authorities when it comes to two-thirds of the project, and we're working on the last one. We don't know the outcome of that yet, but I do want to stress that regardless of the outcome of that third license, we have a project that is worthwhile to move forward with and that we own 100% of. I did mention some of these milestones just previously, but just to reflect that this is a project we've worked on since 2018 for most of those years together with Shell. Now we're taking this project over ourselves, but it is not a project that we will develop ourselves going forward. With this decision, there are three priorities. One is to determine what we can and should do with the third L. Based on that, we're progressing and need to adopt certain project plans full speed ahead. And the third is to set a new and long-term ownership structure for this project. Again, the size and maturity of this project are not something that Hexicon will manage on our own. This process has already started. And just a glance at the remaining portfolio. These are our five core markets. And what I want to highlight is the arrow at the bottom there, displaying the development stage that the projects are in. So there's quite a range in the maturity levels of these projects. And for us as a company, what that means is that we can really leverage the maturity and learnings of some of the projects, particularly the MunmuBaram project in South Korea, to benefit earlier stage projects that are in Italy, Sweden, and South Africa. There also happens to be that a lot of these markets are in regions where there have actually, over the last few months, been positive developments from a political or framework perspective. Just to give you a few short examples, in South Korea, the auction process has improved for Floating Offshore Wind for two reasons. A separate budget has been set aside for floating wind in auctions, so we're not in the same pot as bottom-fixed, and the deadlines and timelines to deliver the project post-auction win have been extended. In Italy, there was a decree announced a few months back for a CFD regime. So basically, it involves an offtake auction for a CFD, where projects receive fixed revenue for the lifetime of the project. All the details aren't out yet, but we're looking at a very attractive scheme and the only market in Europe, to my knowledge at least, that has a CFD mechanism, but without an auction scheme where developers need to pay large amounts upfront for seabed. And lastly, just mention the United Kingdom as well, where they continue on an annual basis to conduct auctions that have increased ceiling prices. And they have, since two years back, a separate pot here as well for floating offshore wind. Now lastly, just look ahead. We are continuing to be very aware of the state of the industry, the state of Hexicon needing to secure and improve our financial structure. So we're very, very, very aware of that. Make no mistake, that is our top priority. I am confident because we now know the status of MunmuBaram, which is our most valuable asset. On that note, the second priority is, of course, to establish a new ownership structure for MunmuBaram now. There are additional divestments that we're looking into and working on today, which we hope to announce over the next period. The core of our business model and financing revenues relates to the divestments of projects. And lastly, of course, ensuring that our core projects remain our focus as we continue to build value across our portfolio, focusing on core projects for the time being. So with that said, I want to thank you all for listening and I'll now take questions, and I'll do that in a way where we, uh, we have questions that have come in. I'm here at our office at the moment, so I'll read out the questions myself and then try to answer them, taking them one by one to see how many we can get through. Um, and the first one we have here is your financial situation seems to be quite strained from what I can read, and your credit facility is due on December 31st. Does this mean that you will run out of money soon? Um, so I partially touched base on it, but I will say that yes, liquidity is constrained. However, where we are confident is that there are several work streams running in parallel to address this, including discussions with the credit facility. We have matured them, but we have not been able to finalize either of them due to the uncertainty surrounding the MunmuBaram project location. So with this again, with this now in place, I do look with confidence upon the future, aiming to solve these issues in the short term. To start with, longer term, we are part of the MunmuBaram project, which is part of the longer-term solution. We're part of the MunmuBaram project, which is part of the longer-term solution. And we'll get back to you as soon as we have news on this. Secondly, you mentioned that you have received approval to take over two out of three blocks. So, those are the licenses in Korea. What will happen with the third? And why didn't you get approval for that? I guess this is partially addressed as well, but there are quite strict requirements to take over licenses like this. We've been able to demonstrate the significant financial backing needed for two-thirds of the projects. So far, we have not given up on the third yet, but at least we have secured two, which is a significant project in itself. So now we have the minimum needed to close the agreement with Shell. We have the minimum needed to progress this very valuable project. Here, I'm reading a third question and the share price has hit rock bottom. What is your plan? Um, a very good question. Although I won't comment and assess the share price itself. What I can say and will say is that we are working to establish a long-term, profitable business. It's a long-term focus, and we are continuing to keep our eyes on it. Now we are in a state of the industry that is rather weak. I definitely believe it will not stay here forever. How long? I cannot say. But the long-term build of our business is our key focus. Sooner or later, I'm sure that reality will catch up from other perspectives as well. But I'm not primarily focused on the share price, and I won't comment on the exact level of it. Another question here. What will happen to all the work that went into the two Swedish projects that the Swedish government rejected? Will you be able to reapply? Um. For the time being, no. I think the government's ruling was pretty clear, so we will not be able to reapply. As of now, we're not investing any more resources into these two projects. With that said, we're, of course, retaining all the background data and value that we've built up on these projects. Who knows what the future holds? That's probably all I can say about that. Um, another question. Do you plan to participate in next year's auction in South Korea? And by when do you expect to have a new owner in place for the project? Um, well, we're right now replanning certain aspects of this based on the new reality, knowing we have to adapt. So far, only two or three requirements have been met. Um, what that means in terms of the auction, I cannot say yet. The next auction is in Q2 next year, and whether we will participate in that or not, I don't know yet. And there are two reasons for it. One is that there are a lot of prerequisites and work needed before you go into an auction to ensure that you participate at the right level and don't expose yourself to any unnecessary risks. And the second reason is that you also need to be advanced enough to ensure that you can fulfill the timeline requirements post auction. So after the auction, you have requirements to reach completion of the projects within a certain amount of time. So, these two aspects we need to consider carefully before we go into that auction. Um, continue here to look at some questions. Uh. Can you elaborate which of the details of MunmuBaram that is still undetermined? Um, yes. What we can probably do is; I'm not sure how to illustrate it. We've got numbers on them, but I don't think that tells you anything. So they're basically the three circular areas that are adjacent to one another. And what we could probably do is present that on a part of our web page. Which one? That is still undetermined and yet to be secured. So let me illustrate that and visualize it on our web page afterwards. Um. Let's see if I have one more. In your press release from February, you state that Shell will receive a profit share arrangement of up to 50 million USD. Can you comment on that? Will there be anything left for Hexicon? Um, yes, there certainly will. And I can't go into all the details of that. But I do want to note that we took over the project at a very reasonable sum in February. Um, and it is a profit share. So it is only when Hexicon makes a profit that a share goes to Shell. It’s a small part, and it decreases over time in tranches during the three years that the profit share is valid, starting from February last year. So with that said, Hope, we've addressed some of the questions at least. Happy to continue and receive questions and answer them in writing as well. And where? We did not get to all of them. But I do want to thank everyone for listening and look forward to getting back to you with new announcements in the near term. Thank you very much for your attention.

Continue to the webcast
Revenio Group Oyj, Q3'26
Language: English11/12/2026, 1:00 PM
Jukka Kainulainen Good afternoon, and welcome to the Revenio Group Corporation Q3 Earnings Call. My name is Jouni Toijala. I am the CEO. And then, again today we have Jukka Kainulainen, our CFO, on th…
Kamux, Q3'26
Language: English11/12/2026, 9:00 AM
Katerina Heterant Good morning. Welcome to the Kamux Q3 results presentation. My name is Katerina Heterant and I am Head of Investor Relations at Kamux. Today we shall go through the Q3 results presen…
Koskisen, Webcast, Q3'26
Language: Finnish11/12/2026, 8:00 AM
Jukka Pahta Hyvää huomenta ja tervetuloa tähän osavuosikatsaustilaisuuteen! Koskisen tammi–syyskuun osavuosikatsaustilaisuuteen lähdetään otsikolla: Koskisen liikevaihdon kasvu jatkui. Kohonneet kusta…
Reaktor, Q3'26
Language: Finnish11/11/2026, 9:00 AM
Pekka Horo Oikein hyvää aamupäivää kaikille ja tervetuloa tähän meidän webcastiimme. Olen Pekka Horo, Reaktorin toimitusjohtaja, ja kanssani täällä on tänään Antti Akkanen, joka aloitti lokakuussa Rea…
Savox, Q3'26
Language: English11/10/2026, 11:00 AM
Paulina Tanila Our speakers today are CEO Jerry Kettunen and CFO Juha Järvi. Jerry will give an overview of Savox as a company and go through the highlights of the quarter. After that, Juha will conti…
Raisio Oyj, Webcast, Q3'26
Language: Finnish11/10/2026, 10:00 AM
Elli Siltala Hyvää marraskuista päivää Raisiosta! Ja tervetuloa Raision tammi-syyskuun 2026 osavuosikatsauksen webcastiin! Pahoittelut pienistä teknisistä haasteista, mitä meillä oli tässä alussa. Min…
Mandatum Oyj, Audiocast, Q3'26
Language: English11/10/2026, 9:00 AM
Lotta Borgström Good morning, everyone, and welcome to the Mandatum Q3 2026 audiocast. My name is Lotta Borgström from Investor Relations. Joining me today are our CEO, Petri Niemisvirta, and our CFO,…
Solar foods Go-to-market Update
Language: English11/9/2026, 12:00 PM
Maria Hello everyone, and welcome to the Solar Foods go-to-market update. My name is Maria and I'm here today with our CEO, Rami Jokela, and CFO and Deputy CEO, Ilkka Saura. Also with us today is Heli…
Outokumpu, Webcast, Q3'26
Language: English11/6/2026, 12:30 PM
Johan Welcome to the third quarter results webcast. I am responsible for investor relations. We will start with the presentation from our CEO, Kati ter Horst, and our CFO, Marc-Simon Schaar. After the…
Endomines, Webcast, Q3'26
Language: English11/5/2026, 1:00 PM
Andy Turpin Hello, everyone, and welcome to Endomines' third-quarter results webcast. Thanks for joining us today. My name is Andy Turpin and I am the Chief Communications Officer here at Endomines. A…
Lemonsoft Oyj, Q3'26 webcast
Language: English11/5/2026, 11:00 AM
Unknown 1 Welcome to the Lemonsoft Q3 results presentation. We will start with the presentation from CEO Alpo Luostarinen, followed by the Q&A. You can send your questions throughout the event via the…
Enersense, Webcast, Q3'26
Language: English11/5/2026, 10:30 AM
Liisa Tamminen Hello and welcome to the Enersense Q3 2026 results webcast. My name is Liisa Tamminen from Enersense Investor Relations. And with me here I have our CEO, Kari Sundbäck, and CFO, Jan-Elo…
Sitowise, Q3'26
Language: English11/5/2026, 10:00 AM
Mari Reponen Good day everyone, and welcome to the Sitowise Q3 2026 results audiocast. My name is Mari Reponen, and I am responsible for strategy and IR here at Sitowise. And today with me are our act…
Orthex, Webcast, Q3'26
Language: English11/5/2026, 9:00 AM
Alexander Rosenlew Good morning and welcome to the Orthex Interim Report. My name is Alexander Rosenlew and with me I have Saara Mäkelä, CFO, and Hanna Kukkonen, our CMSO. We will take you through the…
Suominen Oyj, Q3'26
Language: English11/5/2026, 8:30 AM
Anni Luoma Good morning, everyone, and welcome to the Suominen Q3 webcast. My name is Anni Luoma. I am the Manager of External Communications and Investor Relations at Suominen. Here with me are our P…
Lumo, Webcast, Q3'26
Language: English11/5/2026, 8:00 AM
Niina Saarto Good morning, all. Welcome. This is Lumo Homes plc's third quarter result webcast. I am Niina Saarto from Treasury and Investor Relations. Today I have two gentlemen here with me, namely…
CapMan, Webcast, Q3'26
Language: English11/5/2026, 7:30 AM
Charlotte Good morning and welcome to this presentation of CapMan. Q3 2026 interim report. Presenting today we have Pia Kåll, CEO of CapMan. And after the presentation, we will have a Q&A session. You…
Marimekko, Webcast, Q3'26
Language: English11/4/2026, 12:00 PM
Anna Good afternoon. My name is Anna and I am the IRO of Marimekko. It is my pleasure to welcome you to our Q3 webcast. With me, I have our president and CEO, Tiina Alahuhta, who will walk you through…
Administer, Webcast, Q3'26
Language: Finnish11/4/2026, 9:00 AM
Kimmo Herranen Welcome to the Administer Q3 2026 interim report. Results. Meillä on se alkaa. I am Kimmo Herranen. Kalle Lehtonen. Also. Kaarina og. Yelken. Kalle Lehtonen En el coco. Madan. Parannus.…
Kempower, Webcast, Q3'26
Language: English11/4/2026, 8:30 AM
Unknown 1 Powering the planet. Kempower. We charge our planet for the better. By powering the electric movement. We enable quick and scalable EV charging solutions for everyone and everywhere. We ma…